Operation of LISUN 10KV surge generator
The functioning of a LISUN 10kV surge generator could be different based on the particular type of the generator and the configuration it has been given. Nonetheless, in order to familiarize you with the basics of using a LISUN 10kV surge generator, below is a rundown: Preparation: Before using the surge generator , be certain that the generator has been correctly installed and configured, and that the test equipment has been connected and calibrated in accordance with the specifications provided by the manufacturer. The first step in conducting the test is configuring the surge generator control software with the necessary test settings. These parameters include the voltage level, waveform, and test time. The first step of the test is to push the start button, which can be found on the control software or directly on the surge generator itself. This will get the test started. After that, the surge generator will produce the surge voltage that has been set and apply it to the apparat