How to do IEC61000-4-5 surge test on luminaires with LISUN surge generator?
The following procedures are what need to be taken in order to complete the IEC61000-4-5 surge test on luminaires using a surge generator : Before beginning the test, the luminaire has to be thoroughly cleaned and examined visually to confirm that it is in satisfactory shape to function properly. The luminaire has to have all of its wires and accessories linked to it in the same way that they would be during regular operation. Install the surge generator It is important to install the surge generator in accordance with the instructions provided by the manufacturer. This involves making the proper selection for the test level, determining the waveform, and connecting the generator to the test setup. Connect the luminaire: The luminaire should be linked to the surge generator, often via a network for coupling and decoupling (CDN). In order to ensure that the surge is supplied to the luminaire in a regulated way, the CDN is used to separate the surge generator from the electrical power